Manufacturing ERP · Heavy Industry

ERP Software for Mining Equipment Manufacturing

Mining equipment is a business of deep BOMs, long-lead components, and machines that must keep running at remote sites. ERPKaro connects assembly production, spares inventory, and site dispatch in one system.

01

  • Multi-level BOMs for machines and assemblies

02

  • Spares and service parts stocked by warehouse and site

03

  • Long-lead procurement tracked against build plans

04

  • Site dispatches with complete document packs

What slows mining equipment operations down

01

Deep BOMs are managed in spreadsheets

Machine and assembly BOMs with hundreds of components live in Excel, drifting from what is actually built.

How ERPKaro handles it

BOM management holds multi-level structures with revisions, and production orders consume against them, keeping the build record honest.

02

A missing component stops a whole assembly

Long-lead imports and castings arrive on their own schedule; shortages surface when the fitter reaches for the part.

How ERPKaro handles it

Purchase orders link to build requirements, so shortages against the plan are visible weeks ahead, not at the bench.

03

Spares availability decides customer uptime

Service teams promise parts without knowing which warehouse has them, turning breakdowns into escalations.

How ERPKaro handles it

Multi-location spares inventory shows availability instantly, and transfer or dispatch starts from the same screen.

04

Site dispatches travel with incomplete papers

Heavy consignments to mine sites need invoices, challans, e-way bills, and packing lists assembled from different desks.

How ERPKaro handles it

The dispatch record produces the full document pack, so consignments clear checkpoints and site gates without calls back to office.

05

Service returns disappear into the yard

Components returned for repair or warranty sit unlogged, so neither the customer nor the workshop knows their status.

How ERPKaro handles it

Return order management logs every inbound unit with reason and status, from receipt through repair or replacement.

06

Castings at the machinist go dark

Castings and forgings go out for machining or heat treatment on paper challans, and nobody can say which build is waiting on which job worker.

How ERPKaro handles it

Material is issued against each work order, and every job-work challan stays open until the parts come back, so what is outside and for which build is visible.

07

Long-lead orders wait for a signature

Import and casting orders need approval, and a week lost in sign-off becomes a week lost on the build date.

How ERPKaro handles it

Approval steps for purchases and dispatch, customised to how your plant signs off, are recorded on the order, so pending approvals are visible instead of buried in email.

Worked example: what one late casting costs a machine order

A ₹60 lakh machine is ready for assembly except for one long-lead casting that was ordered late. The build slips three weeks. The contract carries a late-delivery penalty, and 30% of the price is due on dispatch.

The casting itself cost a fraction of that. When purchase orders are linked to build requirements, the system shows which components threaten which build dates while there is still time to expedite.

Illustrative figures, not customer data. Use your own contract terms.

Machine value₹60 lakh
Delay from one late casting3 weeks
Late-delivery penalty at 0.5% a week₹90,000
Cost of ₹18 lakh held for 3 weeks at 12% a year₹12,400
Cost of one late part₹1.02 lakh

How mining equipment teams run ERPKaro

  • BOM Management. Multi-level machine and assembly structures with revisions
  • Production Order Management. Assembly builds consuming components against the BOM
  • Purchase Order Management. Long-lead imports and castings tracked to build dates
  • Item Management. Components, assemblies, and spares with serial batches
  • Return Order Management. Warranty and repair inflows logged with status
  • Document Management. Invoices, challans, packing lists, and e-way bills per consignment

Built for Indian compliance

GST e-invoicing & e-way bill

Heavy consignment documents generated with dispatch

Import documentation

BOE and supplier documents stored against inbound loads

Tally, AI planning, QR scanning and custom reports

Accounts stay in Tally

Tally stays your accounting system. Invoices, credit and debit notes and purchase bills raised in ERPKaro flow to Tally through the integration, set up during implementation to match how your accounts team works.

An AI-drafted production schedule

ERPKaro’s AI planning drafts assembly and machining work orders by build date from open orders, component stock and shop capacity. Your planner reviews the draft, adjusts what needs judgement and approves it.

QR scanning in stores and dispatch

Components and spares carry QR codes, so stores and dispatch scan them at receipt, issue to a build and site dispatch.

Reports built for your plant

Beyond the standard reports, custom reports are built for your plant, such as shortages by build, spares stock by site, or warranty returns by cause. Every figure traces back to the records behind it.

What ERPKaro costs a mining equipment plant

Your price depends on three numbers: the SKUs you maintain each month, your orders per month (sales and purchase orders together), and the user seats you need. Here is what the published pricing gives for one example plant.

A small wear-parts and spares maker supplying mines and crusher operators

  • 180 SKUs maintained per month. Wear parts and spares, castings, bought-out components and consumables
  • 70 orders per month (sales + purchase). Customer and site orders plus purchase orders for castings and components
  • 9 user seats. Planning, stores, production, quality, dispatch and accounts
Pricing bandSmall (up to 10 users)
Billed monthly₹24,000 a month
Billed annually (10% off)₹21,600 a month
One-time setup₹49,999
First year, billed annually₹3,09,199

Estimated with the same formula as the pricing calculator. The final price depends on implementation scope. Extra seats beyond the band are quoted separately.

Going live in a mining equipment plant

Most go-lives take a few days to a few weeks, depending on scope. These are the phases of our implementation process, as they apply here.

  • Discovery. Map the route from order to site: assemblies, long-lead parts, job workers, spares warehouses and customer sites.
  • Master data. Multi-level BOMs with revisions, components and spares, suppliers and importers, and customer sites.
  • Configuration. Purchase orders linked to builds, document packs for site dispatch, and approval steps customised to how your plant signs off.
  • Migration and testing. Opening stock of components and spares reconciled by warehouse, including parts at job workers. Test a shortage against a build and a warranty return.
  • Training. Separate sessions for planning, stores, assembly, quality, dispatch and accounts.
  • Go-live. The first builds and dispatches run on ERPKaro, and the parallel spreadsheets stop after sign-off.

Frequently asked questions

Can ERPKaro handle multi-level BOMs for machines?

Yes. BOMs hold nested assemblies and components with revisions, and production consumes against them, so the build record matches reality.

How does it help with long-lead procurement?

Purchase orders link to build requirements, so the system shows which components threaten which build dates well in advance.

Can spares inventory be tracked across warehouses and sites?

Yes. Spares stock is visible per location, and transfers or customer dispatches start from the same view.

Does it manage warranty and repair returns?

Yes. Return orders log inbound units with reason, condition, and status through repair, replacement, or scrap.

Can it produce complete document packs for site dispatches?

Yes. Invoices, delivery challans, packing lists, and e-way bills generate from the dispatch record as one pack.

Is it suitable for project-based equipment orders?

Yes. Orders, builds, procurement, and dispatches can be tracked against a customer project from start to commissioning.

Can we track castings sent out for machining or heat treatment?

Yes. Material is issued against the work order, and each job-work challan stays open until the parts come back.

Can purchase approvals follow our own rules?

Yes. Approval steps for purchases and dispatch are set up to match how your plant signs off, and every approval is recorded on the order.

Can we keep Tally for our accounts?

Yes. Tally stays your accounting system and ERPKaro runs the plant. Invoices, credit and debit notes and purchase bills raised in ERPKaro flow to Tally through the integration, set up during implementation.

What does ERPKaro cost for a mining equipment plant?

Pricing depends on SKUs maintained, orders per month (sales and purchase orders together) and user seats. A small wear-parts and spares maker with about 180 SKUs, 70 orders a month and 9 users falls in the Small band, around ₹24,000 a month plus a one-time ₹49,999 setup fee. The pricing calculator gives your own estimate.

See your mining equipment operation on ERPKaro

Walk through your workflows with our team, or take the five-minute ERP readiness assessment to see where you stand.