Solutions · Replacing your existing ERP

When your ERP records the factory but does not run it

Many ERPs are accounts-first: they store transactions after the work is done. If your team still plans, chases and coordinates outside the system, ERPKaro is built the other way round, around production, materials and dispatch hand-offs.

01

  • Workflow-first, not accounts-first

02

  • Configured around your real hand-offs

03

  • Master data and history migrated and reconciled

04

  • Planned cutover with sign-off

A replacement you can plan, phase by phase

Each phase has the checks that keep the switch safe.

Signs your current ERP is the wrong fit

01

Work still happens outside it

Production plans, shortages and dispatch status live in spreadsheets next to the ERP.

How ERPKaro handles it

ERPKaro is built around those workflows, so the system is where the work happens.

02

Every change needs a consultant

Adding a step or a field means a change request and a long wait.

How ERPKaro handles it

Workflows are configurable, with customisation scoped and agreed up front.

03

The team works around it

Users enter data at day end just to keep the system quiet.

How ERPKaro handles it

When the system is the easiest way to do the job, the data stays current.

A switch you can plan

  1. DiscoveryCurrent process, systems, volumes and pain points documented.
  2. ConfigureApprovals, statuses and hand-offs set up for your teams.
  3. MigrateMasters and open balances cleaned, mapped and reconciled.
  4. TestEnd-to-end runs, including partial receipts, QC failures and returns.
  5. Cut overOpening balances signed off, support in place, go live.

What makes the switch lower-risk

Scoped up front

Standard configuration, customisation and integrations agreed separately.

Reconciled data

Opening stock and masters checked before cutover, not after.

Real-scenario testing

Shortages, partial dispatches and substitutions tested, not just the happy path.

Role-based training

Each team trained on the steps they own.

Stabilisation support

Data quality and adoption reviewed after go-live.

Measured by outcomes

Success is judged by operational results, not logins.

Frequently asked questions

Can our historical data be moved?

Master data and open balances are migrated and reconciled. How much transaction history to bring across is agreed during scoping.

How long does a replacement take?

It depends on scope: locations, workflows, integrations and customisation. We give a scoped plan after discovery.

Can we run both systems in parallel?

A short parallel period can be planned into the cutover. We help you retire the old system cleanly once opening balances are signed off.

Will we lose features we use today?

Discovery lists what you use today and how it maps to ERPKaro, including anything that would stay in another system, before you commit.

Talk through a replacement

Book a demo with your current pain points. We will be straight about what fits and what does not.