ERPKaro turns accepted orders into production orders, checks routing and material readiness before release, and schedules work by machine, crew and shift. Everyone sees the same plan, and the same progress, as the shift runs.

01

  • Work orders planned against live material availability

02

  • Routing steps checked before a job is scheduled

03

  • Machine, crew and shift assignment per work order

04

  • Live progress, WIP and QC holds on one board

From the whiteboard to a plan everyone can see

The same day of work, before and after. The board on the right updates as the shift runs.

Today: the planning whiteboard
With ERPKaro: one live record

Where production plans usually break

01

Plans are made without knowing material status

A work order goes onto the whiteboard, then the line waits because a component is short or still in inbound QC.

How ERPKaro handles it

Material readiness is checked against eligible stock before release, so a short job is flagged at planning, not at the machine.

02

The plan changes, but only some people hear about it

A rush order reshuffles the day. Stores, QC and dispatch find out through calls, after the fact.

How ERPKaro handles it

The schedule is one shared record. A change to sequence or quantity is visible to every team working from it.

03

Nobody knows true progress until the shift ends

Output, WIP and rejections are written on paper and keyed in later, so delays surface a day too late.

How ERPKaro handles it

Production batches are updated during execution, so output, WIP and QC holds show while there is still time to act.

For owners and plant heads

What you can answer without calling the floor

  • Can we commit to this delivery date?The schedule and material readiness show whether the job can start, and when it will finish.
  • Which line is behind right now?Live progress per work order and shift, updated as batches are recorded.
  • What is stuck in QC?QC holds listed with their batch and work order, so nothing ships before release.

From order to finished goods

Every step updates the same production record, so planning, stores, the shop floor and quality never work from different versions.

  1. Accept the requestApproved demand becomes a production order with BOM and quantity.
  2. Check routingRouting steps and work centres are validated before scheduling.
  3. Schedule the workSequence by machine, crew and shift, manually or with AI assistance.
  4. Issue materialProduction requests material, stores records the actual issue, production confirms receipt.
  5. Run and releaseBatches are recorded on the floor; finished goods pass QC before they count as stock.

What planners and plant heads get

Production orders

Accept requests as production orders with BOM version, quantity and due date attached.

Routing and work centres

Define routing steps and cycles, then check them before a job reaches the schedule.

Machine, crew and shift

Assign each work order to the line, team and shift that will run it.

Material readiness

See which jobs are fully kitted, partly short or blocked before you release them.

Live progress and WIP

Track output per batch and per shift as the work happens, not at day end.

QC holds

A batch on QC hold cannot move downstream until it is released or dispositioned.

Frequently asked questions

Can ERPKaro schedule by machine and shift?

Yes. Work orders are assigned to machines, crews and shifts, and the schedule shows what each line is running and when.

Do I have to use AI scheduling?

No. Scheduling can be manual or AI-assisted. AI suggestions are a starting point that your planner reviews and approves.

How does it know whether material is available?

Material readiness is checked against eligible stock, meaning stock that has been received and has passed inbound QC, not just stock on order.

Can we track WIP during the shift?

Yes. Production batches are updated during execution, so output, WIP and QC holds are visible while the shift is still running.

Does it connect to our machines directly?

Direct machine, PLC or SCADA connections are not a standard feature. Progress is recorded by your team in ERPKaro; machine integrations can be scoped separately if you need them.