Manufacturing ERP · Specialized Manufacturing

ERP for Semiconductors & Electronics Components

Component manufacturing and assembly run on date codes, moisture sensitivity, and import lead times measured in months. ERPKaro keeps lot codes, MSL handling, and procurement pipelines on one accountable system.

01

  • Lot and date codes tracked through assembly

02

  • MSL exposure windows respected at issue

03

  • Import pipelines visible against build plans

04

  • ESD-safe storage locations modeled explicitly

What slows semiconductors & electronics components operations down

01

Date codes disappear at kitting

Reels are kitted without recording which lot fed which build, breaking traceability customers demand.

How ERPKaro handles it

Issues record lot and date codes against the build, preserving traceability through assembly.

02

MSL parts exposure is untracked

Moisture-sensitive parts sit opened beyond their floor life, becoming silent reliability risks.

How ERPKaro handles it

MSL attributes and exposure tracking flag parts that need baking before they reach the line.

03

Import lead times blindside builds

Components on 20-week lead times are reordered when the bin is empty, not when the pipeline demands.

How ERPKaro handles it

Purchase pipelines link to build plans, surfacing shortfalls months ahead, not days.

04

Counterfeit risk demands provenance

Source documentation per lot is scattered, weakening provenance claims when customers ask.

How ERPKaro handles it

Supplier documents attach to inbound lots, keeping provenance retrievable per lot.

How components teams run ERPKaro

  • Item Management. Parts with lot, date-code, and MSL attributes
  • Inbound Load Management. Import receipts with supplier docs and BOE references
  • Purchase Order Management. Long-lead pipelines tracked to build plans
  • Production Order Management. Builds consuming recorded lots and date codes
  • Quality Control (QC). Incoming and post-assembly inspection per lot
  • Document Management. Provenance docs, invoices, and e-Way Bills per lot

Built for Indian compliance

GST e-invoicing & e-Way Bill

Domestic dispatch documents per consignment

Import documentation

BOE and supplier certificates stored per inbound lot

Customer traceability

Lot and date-code chains retrievable per query

Frequently asked questions

Can ERPKaro track lot and date codes through assembly?

Yes. Issues record which lots fed which builds, so traceability survives kitting and assembly.

Does it manage moisture-sensitive (MSL) parts?

Yes. MSL attributes and exposure tracking flag parts needing baking before they reach the line.

How does it handle long import lead times?

Purchase pipelines are visible against build plans, so 20-week parts are ordered by the pipeline, not by the empty bin.

Can provenance documents be kept per lot?

Yes. Supplier certificates and BOE references attach to inbound lots and stay retrievable for customer queries.

Is it suitable for EMS assembly businesses?

Yes. Customer-supplied and own components are tracked distinctly through the same lot-controlled workflows.

See your components operation on ERPKaro

Walk through your workflows with our team, or start a 7-day free trial and explore at your own pace.