Manufacturing models · Configure-to-order
Configure-to-order ERP where every configuration gets its own BOM and its own purchasing
In configure-to-order, customers choose from options you have already defined: motor rating, enclosure, material of construction, accessories. ERPKaro records the configuration on the order, takes the configuration-specific BOM your design team uploads through a custom template, creates procurement requests from it and takes the build through assembly, QC and dispatch.
01
- Selected options recorded on the sales order
02
- A custom BOM uploaded for each order
03
- Material availability checked per configuration
04
- Procurement requests created from the BOM
The ERPKaro workflow
How ERPKaro runs configure-to-order
From the moment a customer picks a configuration, every step runs against it, starting with the BOM your design team uploads for it.
-
Customer order arrives
Customer configuration
The sales order records the options the customer selected, so the configuration travels with the order.
In ERPKaroSales & Purchase Orders -
Configuration-specific BOM
The design or project team fills ERPKaro’s custom BOM template for this configuration and uploads it against the order.
In ERPKaroBOM & Material Requirements Planning -
Material availability
Each line of the uploaded BOM is checked against eligible stock, and option-specific shortages are flagged.
In ERPKaroBOM & Material Requirements Planning -
Procurement
Procurement requests are created on their own from the uploaded BOM, then move to purchase orders linked to the build.
In ERPKaroProcurement Management -
Assembly and production
Work orders follow the configuration’s routing, and material is issued against the job.
In ERPKaroProduction Planning & Scheduling -
Quality control
Stage and final inspections are recorded against the build.
In ERPKaroQuality Control
Is configure-to-order your model?
Manufacturing products using predefined configurations and selectable components based on customer requirements.
You probably run this model if
- Customers choose from options you already offer, not new designs
- The same base product ships in many variants
- Sales checks with engineering before confirming each variant
- The wrong component on a build is a common cause of rework
Industries that commonly run this way
- Industrial machinery
- Electrical panels
- Pumps
- Modular equipment
Where configure-to-order goes wrong
01
The configuration is in an email, not on the order
Sales confirms a 7.5 kW pump with a stainless impeller over email. The shop floor builds from the standard BOM, and the mistake is found at testing.
How ERPKaro handles it
The selected options are recorded on the sales order, and the BOM uploaded for that order is the one the shop builds from.
02
Every variant’s BOM is rekeyed by hand
Engineering sends a spreadsheet, and someone retypes it line by line into purchasing, where small errors slip through.
How ERPKaro handles it
The design team fills ERPKaro’s custom BOM template and uploads it against the order, so the BOM arrives complete and nobody retypes it.
03
Option-specific parts arrive after the build date
Common parts are in stock, but the special seal or the larger enclosure is ordered late, because nobody checked the configuration against stock.
How ERPKaro handles it
Uploading the BOM creates procurement requests on their own, and material availability flags the option-specific shortages, so the special parts are on order early.
For owners and plant heads
What you can answer before you confirm a date
- What exactly did we promise this customer?The selected options on the sales order, and the BOM uploaded for them.
- Is the material for this configuration available?Availability per component of the order’s BOM, with shortages flagged.
- Which builds are waiting for option-specific parts?Procurement requests and purchase orders linked to each build.
Illustrative example
An electrical panel builder
The plant
A panel builder offers a base distribution panel with options for incomer rating, enclosure, metering and IP rating. About half its orders differ from each other in at least one option.
A typical plant described for illustration, not a customer.
How it runs in ERPKaro
- Sales records the customer’s choices on the order: 400 A incomer, IP55 enclosure, digital metering.
- The design team fills the custom BOM template for this configuration and uploads it against the order.
- Material availability shows the breaker and busbar in stock and the IP55 enclosure short.
- Procurement requests are created from the uploaded BOM, and the enclosure moves to a purchase order linked to this order.
- Assembly runs against the order’s BOM, and stage inspections are recorded on the job.
- Final QC passes the panel, and it is dispatched with its documents.
Purchasing, stores and the shop floor all work from the BOM for this panel, not the nearest standard one.
What configure-to-order plants use in ERPKaro
Options on the sales order
The customer’s selections are part of the order record, not a side note.
Custom BOM template
Your design or project team fills the template and uploads the BOM for each configuration.
BOM versions
Each BOM keeps its version, so the build, purchasing and QC refer to the same one.
Material availability
Each component netted against eligible stock before the build is released.
Automatic procurement requests
Requests created from the uploaded BOM, moving to purchase orders linked to the build.
Stage and final QC
Inspections recorded against the build, from stage checks to final test.
The other five manufacturing models
Many plants run more than one. Each model has its own page on how ERPKaro runs it.
- Make-to-Stock Stock-led production, orders fulfilled from it
- Assemble-to-Order Stocked components, assembly on order
- Make-to-Order Production against confirmed orders
- Engineer-to-Order Engineering and design for each project
- Process & Batch Recipes, batches and batch-wise QC
Frequently asked questions
What is configure-to-order manufacturing?
Configure-to-order (CTO) is a model where customers choose from predefined options and components, and the product is built to that configuration after the order. Pumps, electrical panels and modular machinery are common examples.
How is configure-to-order different from assemble-to-order?
In assemble-to-order, the components and subassemblies are already in stock and only final assembly waits for the order. In configure-to-order, the configuration decides the BOM, so some option-specific parts are bought or made after the order arrives.
How is configure-to-order different from engineer-to-order?
In configure-to-order, every option has already been designed, so no new engineering is needed per order. Engineer-to-order designs or modifies the product for each customer project.
How does each configuration’s BOM get into ERPKaro?
Your design or project team fills ERPKaro’s custom BOM template for the order and uploads it. Procurement requests are then created from the uploaded BOM on their own, so purchasing starts without anyone retyping it.
Can we run more than one manufacturing model in the same plant?
Yes. Stock runs and order-specific jobs are production orders in one plan, with material reserved per job, so they share the same machines, stores, QC and dispatch without a second system.