Manufacturing models
Six manufacturing models, one operations platform
Whether you manufacture against forecasts, customer configurations, confirmed orders, engineering designs or batch formulations, ERPKaro connects your procurement, inventory, production, quality and dispatch workflows in one manufacturing operations platform.
- Procurement
- Inventory
- Production
- Quality
- Dispatch
01
- Six models, from forecast-led stock to engineered projects
02
- One record from purchase to dispatch, whatever the model
03
- Stock runs and order-specific jobs in one plan
04
- QC holds and batch tracking in every model
The decoupling point
Where the customer order enters your factory
The real difference between manufacturing models is the point at which a customer order starts to drive the work. Everything before that point is planned ahead, to a forecast. Everything after it runs against the order.
| Model | Design | Buy material | Make or process | Assemble or pack | Hold finished stock | Dispatch |
|---|---|---|---|---|---|---|
| Make-to-Stock MTS | Planned ahead of the order | Planned ahead of the order | Planned ahead of the order | Planned ahead of the order | Planned ahead of the order | Run against the order |
| Assemble-to-Order ATO | Planned ahead of the order | Planned ahead of the order | Planned ahead of the order | Run against the order | Not held | Run against the order |
| Configure-to-Order CTO | Planned ahead of the order | Partly ahead, partly against the order | Run against the order | Run against the order | Not held | Run against the order |
| Make-to-Order MTO | Planned ahead of the order | Run against the order | Run against the order | Run against the order | Not held | Run against the order |
| Engineer-to-Order ETO | Run against the order | Run against the order | Run against the order | Run against the order | Not held | Run against the order |
| Process & Batch | Planned ahead of the order | Planned ahead of the order | Ahead or against the order | Ahead or against the order | Ahead or against the order | Run against the order |
- Planned ahead of the order
- Partly ahead, partly against the order
- Run against the order
- Not held
- Ahead or against the order
- Customer order enters
- Design
- Buy material
- Make or process
- Assemble or pack
- Hold finished stock
- Dispatch
Process and batch manufacturing is about how product is made, by recipe and in batches, so it can run to a forecast or against orders.
Find the page for how you manufacture
Each page walks through the model step by step: the ERPKaro workflow, where it usually breaks, and a worked example.
-
01
Make-to-Stock MTS
Manufacturing based on forecasted demand and inventory replenishment. Automotive components · Fasteners · Plastics · Electrical goods How ERPKaro runs it -
02
Configure-to-Order CTO
Manufacturing products using predefined configurations and selectable components based on customer requirements. Industrial machinery · Electrical panels · Pumps · Modular equipment How ERPKaro runs it -
03
Assemble-to-Order ATO
Standard components and subassemblies are stocked, while final assembly begins after receiving a customer order. Electronics · Electrical panels · Modular furniture · Industrial equipment How ERPKaro runs it -
04
Make-to-Order MTO
Production starts against a confirmed customer order rather than maintaining finished goods stock. Fabrication · Custom furniture · Industrial components · Job shops How ERPKaro runs it -
05
Engineer-to-Order ETO
Engineering, design and product specifications are developed or modified specifically for each customer project. Special-purpose machinery · Capital equipment · Industrial automation equipment · Turnkey engineering How ERPKaro runs it -
06
Process & Batch
Manufacturing through recipes, formulations, controlled processing stages and batch-wise production. Food processing · Protein supplements · Chemicals · Paints · Beverages · Specialty materials How ERPKaro runs it
Not sure which one you are?
Find your model in four questions
Answer for one product line. Most plants run more than one model, so try it again for the next line.
Question 1
How is your product made?
Question 2
When does production start?
Question 3
What does the customer decide?
Question 4
When the order arrives, are the parts already in stock?
Your model is most likely
Make-to-Stock (MTS)
Manufacturing based on forecasted demand and inventory replenishment.
See how ERPKaro runs make-to-stockYour model is most likely
Configure-to-Order (CTO)
Manufacturing products using predefined configurations and selectable components based on customer requirements.
See how ERPKaro runs configure-to-orderYour model is most likely
Assemble-to-Order (ATO)
Standard components and subassemblies are stocked, while final assembly begins after receiving a customer order.
See how ERPKaro runs assemble-to-orderYour model is most likely
Make-to-Order (MTO)
Production starts against a confirmed customer order rather than maintaining finished goods stock.
See how ERPKaro runs make-to-orderYour model is most likely
Engineer-to-Order (ETO)
Engineering, design and product specifications are developed or modified specifically for each customer project.
See how ERPKaro runs engineer-to-orderYour model is most likely
Process & Batch
Manufacturing through recipes, formulations, controlled processing stages and batch-wise production.
See how ERPKaro runs process & batchMost plants run more than one model
A plant rarely fits one textbook model. Standard products go to stock while specials are made to order; a machine builder stocks subassemblies for one range and engineers another from scratch. You do not need a system for each.
One fastener plant, two models
- Reorder level
- Production run
- QC release
- Stock
- Order and dispatch
- Order
- Wire rod PO
- Production run
- QC release
- Dispatch
- Wire-rod stock
- Machines and shifts
- QC checklists
- Dispatch
Both are production orders in one plan. Wire rod received for the OEM job is reserved for it, so the stock run cannot use it, and both lanes pass the same QC before anything ships.
The six models side by side
| Criterion | Production starts with | Finished-goods stock | What the customer decides | Lead time is set by |
|---|---|---|---|---|
| Make-to-Stock (MTS) | Stock levels and reorder triggers | Held ahead of orders | Quantity and delivery date | Picking and dispatch, when stock is there |
| Configure-to-Order (CTO) | The configuration a customer selects | Not held; common parts often are | Options from a defined list | Option-specific parts, then assembly |
| Assemble-to-Order (ATO) | A customer order, for final assembly | Not held; components and subassemblies are | Which standard variant, and how many | Final assembly and testing |
| Make-to-Order (MTO) | A confirmed customer order | None, beyond orders awaiting dispatch | Product, quantity, often the drawing | Buying material, then production |
| Engineer-to-Order (ETO) | A customer requirement | None | The design itself | Engineering, then purchasing from the BOM |
| Process & Batch | Stock levels or orders, in batch sizes | Usually held, by batch and expiry | Product and pack size | Processing and batch release |
A general guide. Real plants often sit between two models, or run different models for different product lines.
Frequently asked questions
What are the main types of manufacturing models?
The common ones are make-to-stock (MTS), assemble-to-order (ATO), configure-to-order (CTO), make-to-order (MTO) and engineer-to-order (ETO), which differ in when the customer order starts to drive production. Process or batch manufacturing describes how product is made: by recipe, in batches. It can run to stock or to order.
What is the difference between make-to-stock and make-to-order?
Make-to-stock produces ahead of demand, so orders ship from finished stock and lead times are short, at the cost of holding inventory. Make-to-order waits for a confirmed order before buying and producing, so stock stays low but every order carries purchase and production time.
What is a customer order decoupling point?
It is the point in the value chain where work stops being planned to a forecast and starts being driven by a specific customer order. In make-to-stock it sits just before dispatch; in assemble-to-order, before final assembly; in engineer-to-order, before design.
Can we run more than one manufacturing model in the same plant?
Yes. Stock runs and order-specific jobs are production orders in one plan, with material reserved per job, so they share the same machines, stores, QC and dispatch without a second system.
Which manufacturing model has the shortest lead time?
Make-to-stock, because the product is already made when the order arrives. Assemble-to-order is next, since only final assembly remains. Engineer-to-order has the longest, as design and long-lead purchasing come first.
Does ERPKaro need separate modules for each model?
No. Every model uses the same procurement, inventory, production, quality and dispatch records. What changes is where planning starts: from stock levels, a configuration, an order, a design or a recipe.
Keep exploring
See your manufacturing model running in ERPKaro
Book a demo built around how you make product, or start with the readiness assessment.