Manufacturing models · Make-to-order
Make-to-order ERP that ties every purchase, job and check to the order
In make-to-order, nothing is built until a customer confirms. That keeps finished stock low, but every order has to be planned, bought for and produced to a date. ERPKaro carries the order through BOM, material planning, purchasing, production, QC and dispatch as one record, so anyone can see where it stands.
01
- Purchase and work orders linked to the customer order
02
- Material reserved per job
03
- Job-work challans tracked until return
04
- Order status from booking to dispatch
The ERPKaro workflow
How ERPKaro runs make-to-order
The order comes first, and every step after it runs against that order. Each step is recorded in an ERPKaro module, so the order’s status is never a guess.
-
Customer order arrives
Customer order
The order is confirmed with quantity, specification and delivery date.
In ERPKaroSales & Purchase Orders -
Bill of materials
The BOM for the product, or the customer’s drawing revision, is attached to the order.
In ERPKaroBOM & Material Requirements Planning -
Material requirements planning
The order’s requirements are netted against eligible stock, so only the shortfall is planned for purchase.
In ERPKaroBOM & Material Requirements Planning -
Procurement
Purchase orders are raised against the customer order, and receipts are recorded as they arrive.
In ERPKaroProcurement Management -
Production
Work orders run against the order; outside operations go out on job-work challans and are tracked until they return.
In ERPKaroProduction Planning & Scheduling
Is make-to-order your model?
Production starts against a confirmed customer order rather than maintaining finished goods stock.
You probably run this model if
- You do not start production until a customer confirms
- Orders differ in specification, drawing or quantity
- Delivery promises depend on how fast you can buy material
- Customers call to ask where their order is
Industries that commonly run this way
Where make-to-order deliveries slip
01
Nobody can say where an order is
The customer asks for a status update, and sales calls purchase, stores and the supervisor to piece one together.
How ERPKaro handles it
The order links to its purchase orders, work orders, inspections and dispatch, so its status is one screen, not four phone calls.
02
Material bought for one order is used for another
Steel received for a confirmed job is cut for a rush order, and the first job slips by a week.
How ERPKaro handles it
Material is reserved per job, so stock received for one order does not count as free for the next.
03
Dates are promised before material is checked
Sales commits to four weeks; purchasing then finds the plate takes five to arrive.
How ERPKaro handles it
MRP nets the order’s BOM against stock when it is booked, so shortfalls are known before a date is committed.
For owners and plant heads
What you can answer when the customer calls
- Where is this customer’s order right now?Its purchase orders, work orders, inspections and dispatch on one record.
- Which orders are at risk of missing their date?Orders with open shortages, or work orders running behind.
- What is out with job workers for this order?Job-work challans per order, with what is still to come back.
Illustrative example
A fabrication shop
The plant
A fabrication shop builds structural assemblies, frames and skids to customer drawings. No two orders are the same, and some operations, such as galvanising, go to outside job workers.
A typical plant described for illustration, not a customer.
How it runs in ERPKaro
- The order is booked with the customer’s drawing revision and a delivery date.
- The BOM for the assembly is attached and netted against plate, section and fastener stock.
- The plate shortfall becomes a purchase order linked to this job.
- Cutting, welding and fit-up run as work orders against the job, with material issued to each.
- Assemblies go to the galvaniser on a job-work challan, tracked until they come back.
- Final inspection passes, and the order is dispatched.
Every purchase, issue and inspection on the job traces back to the order that needed it.
What make-to-order plants use in ERPKaro
Order-linked purchasing
Purchase orders raised against the customer order that needs them.
Material reservation per job
Stock received for one order stays with that order.
Drawing revisions
The customer’s drawing revision kept with the job, so the shop builds to the right one.
Job-work challans
Material sent to job workers tracked until it returns, with the balance per job worker.
Live work-order progress
Each job’s progress updated as the shift runs, not at day end.
Inspection records per job
Stage and final inspections recorded against the order they belong to.
The other five manufacturing models
Many plants run more than one. Each model has its own page on how ERPKaro runs it.
- Make-to-Stock Stock-led production, orders fulfilled from it
- Configure-to-Order Selected options, a custom BOM per order
- Assemble-to-Order Stocked components, assembly on order
- Engineer-to-Order Engineering and design for each project
- Process & Batch Recipes, batches and batch-wise QC
Further reading
Frequently asked questions
What is make-to-order manufacturing?
Make-to-order (MTO) is a model where production starts only after a confirmed customer order, instead of building finished-goods stock. Fabrication shops, custom furniture makers and industrial component suppliers commonly work this way.
How does ERPKaro plan material for make-to-order?
When an order is booked, its BOM is netted against eligible stock. The shortfall becomes purchase requests and purchase orders linked to that order, and material is reserved for the job as it arrives.
Can we track job work for a make-to-order job?
Yes. Material sent out for operations such as galvanising or machining goes on job-work challans and is tracked until it returns, with the balance visible per job worker.
How is make-to-order different from engineer-to-order?
In make-to-order, the product is already defined, as a standard design or the customer’s drawing, before production starts. In engineer-to-order, designing the product is part of the order itself.
Can we run more than one manufacturing model in the same plant?
Yes. Stock runs and order-specific jobs are production orders in one plan, with material reserved per job, so they share the same machines, stores, QC and dispatch without a second system.
Keep exploring
See one order from booking to dispatch
Book a demo with one of your own recent orders, or start with the readiness assessment.