Manufacturing models · Engineer-to-order

Engineer-to-order ERP that keeps design, BOM and build on one project

In engineer-to-order, the product is designed or modified for each customer. The BOM does not exist until engineering finishes it, purchasing waits on it, and builds run for weeks or months. ERPKaro takes the BOM your design team uploads for the project, creates procurement requests from it, and links every stage, from design and BOM approval through staged production and QC to dispatch and installation, to the customer’s project.

01

  • A custom BOM uploaded for every project

02

  • Procurement requests created from the BOM

03

  • Multi-level BOMs and staged builds

04

  • Installation tracked against the ASN

The ERPKaro workflow

How ERPKaro runs engineer-to-order

Nothing is fixed before the order. From the customer’s requirement onwards, every step belongs to that project.

  1. Customer order arrives

    Customer requirement

    The requirement is recorded against a project for the customer.

    In ERPKaroSales & Purchase Orders
  2. Engineering and design

    Design work produces the drawings, and the design team uploads the project BOM through ERPKaro’s custom BOM template, with revisions kept on record.

    In ERPKaroBOM & Material Requirements Planning
  3. BOM approval

    The BOM goes through an approval step before it drives purchasing, so buyers order from a signed-off list.

    In ERPKaroBOM & Material Requirements Planning
  4. Procurement

    Procurement requests are created on their own from the uploaded BOM and move to purchase orders against the project; receipts and inspections are recorded on it.

    In ERPKaroProcurement Management
  5. Production

    Staged builds run as work orders under the project, with multi-level BOMs for the assemblies.

    In ERPKaroProduction Planning & Scheduling
  6. Quality control

    Stage inspections and trial runs are recorded against the build.

    In ERPKaroQuality Control
  7. Installation or dispatch

    The machine ships as one unit or in several packages with its ASN, the dispatch list, and installation teams update their workflow against it at site.

    In ERPKaroDispatch Management

Is engineer-to-order your model?

Engineering, design and product specifications are developed or modified specifically for each customer project.

You probably run this model if

  • Each order needs design or engineering work before it can be built
  • BOMs change while the build is already under way
  • Builds take weeks or months and ship in several packages
  • Purchasing waits for engineering to finish the BOM

Industries that commonly run this way

What the customer decides The design itself
Not sure? Compare all six models

Where engineer-to-order projects overrun

01

Purchasing buys from an unapproved BOM

Engineering is still revising the design when a buyer orders from last week’s list, and a gearbox arrives that no longer fits.

How ERPKaro handles it

The BOM is uploaded through ERPKaro’s template and approved before procurement requests come from it, and revisions stay on record, so everyone knows which version is current.

02

The project’s parts are scattered across the stores

Parts bought for one machine sit in general stock. By assembly, some have been used elsewhere and others cannot be found.

How ERPKaro handles it

Purchases, receipts and issues are linked to the project, and material is reserved for it, so the build’s parts stay accounted for.

03

Build progress is invisible between milestones

The customer is told the machine is 70% done, but nobody can say which subassemblies are complete and which are waiting.

How ERPKaro handles it

Staged builds run as work orders under the project, so completed, running and waiting assemblies are visible at any point.

For owners and plant heads

What you can answer at the project review

  • Which BOM version is the shop building to?The approved BOM and its revision history on the project.
  • What has been bought for this project, and what is still due?Purchase orders and receipts linked to the project.
  • How far along is the build, really?Work orders for each stage and subassembly, with their status.

Illustrative example

A special-purpose machine builder

The plant

A builder of special-purpose assembly machines takes on eight to twelve projects a year. Each starts from the customer’s part and cycle time, and the design is new or heavily adapted every time.

A typical plant described for illustration, not a customer.

How it runs in ERPKaro

  1. The customer’s requirement is recorded against a new project.
  2. Engineering releases the general arrangement and uploads the first BOM through the custom BOM template.
  3. The BOM is approved, and procurement requests for its items are created on their own, then moved to purchase orders against the project.
  4. Bought-out parts arrive against the project, and fabricated assemblies are released as work orders under it.
  5. Subassemblies are built and inspected stage by stage, then the machine is assembled and trial-run.
  6. The machine ships in four packages with its ASN, and the installation team updates its workflow against that list at site.

Engineering, purchasing and the shop floor work from the same approved BOM, and the project shows what has been bought, built and inspected.

What engineer-to-order manufacturers use in ERPKaro

Custom BOM upload

Your design team’s BOM uploaded through a template for every project, ready for approval.

Automatic procurement requests

Requests created from the uploaded BOM, moving to purchase orders against the project.

BOM approval steps

Approval before a BOM drives purchasing, customised to how your engineers sign off.

Drawing and BOM revisions

Every revision kept on record, with the current one clear to the shop floor.

Staged builds

Each stage and subassembly a work order, so progress is visible between milestones.

Dispatch and installation

Multi-package dispatch with an ASN that installation teams update their workflow against.

Frequently asked questions

What is engineer-to-order manufacturing?

Engineer-to-order (ETO) is a model where engineering, design and product specifications are developed or modified for each customer project. Special-purpose machinery, capital equipment and turnkey engineering projects are typical examples.

How does ERPKaro handle BOM changes during a project?

Each BOM revision is kept on record, and a BOM goes through an approval step before it drives purchasing, so buyers and the shop floor always work from the approved version.

How does purchasing start on an engineer-to-order project?

When the design team uploads the project BOM through ERPKaro’s custom template, procurement requests are created from it on their own. They move to purchase orders against the project, so buyers never rekey the BOM.

Does ERPKaro replace our CAD or design software?

No. Design stays in your CAD tools. ERPKaro holds the BOM you upload, its revisions and approvals, and everything that follows: purchasing, production, inspection, dispatch and installation.

How do installation teams use ERPKaro?

The machine ships with its ASN, the dispatch list of what went out, in one or several packages. Installation teams update their workflow against that list at site.

See a project from requirement to dispatch

Book a demo built around one of your own projects, or start with the readiness assessment.