Manufacturing ERP · Industrial & Engineering

ERP Software for Automotive & Auto Component Manufacturing

Component plants run on OEM schedules and zero tolerance for misses. ERPKaro links schedule-driven production, batch traceability, and ASN-based dispatch so OEM lines are fed on time, with the paperwork already done.

01

  • OEM schedules converted to production and dispatch plans

02

  • Batch and lot traceability per part number

03

  • ASN-driven dispatch to OEM docks

04

  • Rejections and returns tracked to root batch

What slows automotive & auto components operations down

01

OEM schedules change faster than your plan

Weekly schedules arrive amended; production plans on whiteboards lag a revision behind, risking line-stoppage penalties.

How ERPKaro handles it

Schedule lines become production and dispatch orders in the system, so a revision updates the plan everyone works from.

02

Traceability requests take days to answer

When an OEM quarantines a lot, mapping which heats, batches, and shifts produced it means manual cross-referencing.

How ERPKaro handles it

Batches link raw material, production run, and dispatch, so a lot query returns the full chain in one lookup.

03

Dispatch paperwork delays the truck

ASNs, invoices, and e-way bills are prepared by different people after loading, pushing departures past the window.

How ERPKaro handles it

ASN, invoice, challan, and e-way bill generate from the dispatch record before the vehicle is loaded.

04

Rejections come back without a story

Returned parts arrive with debit notes but no link to the original batch, so corrective action is guesswork.

How ERPKaro handles it

Return orders reference the original dispatch and batch, feeding QC the exact production context.

05

Parts at the plater or heat treater go dark

Plating, heat treatment and powder coating go out to job workers on paper challans. When the schedule is due, nobody can say how many parts are still outside or which order they belong to.

How ERPKaro handles it

Material is issued against each work order, and every job-work challan stays open until the parts come back, so what is outside, with whom and for which schedule is one search away.

06

Bar stock and castings arrive after the schedule needs them

Buyers order raw material from last month’s consumption while the OEM has already raised next month’s schedule.

How ERPKaro handles it

Purchase planning sees current stock, in-transit loads and confirmed schedule demand in one place, so buying follows the schedule instead of the average.

Worked example: what batch traceability saves on one OEM complaint

A Tier-2 unit ships 12,500 machined parts a week to an OEM line in batches of 2,000. The OEM finds a defect and asks the supplier to sort every suspect part at its plant, usually through a third-party sorting agency billed to the supplier.

The sorting bill is the visible part. A smaller suspect lot also means fewer parts on hold at the OEM, a shorter quarantine and a cleaner answer when the customer asks for corrective action. That only works when every dispatched lot links back to its production run and raw-material batch.

Illustrative figures, not customer data. Use your own volumes and sorting rates.

Parts shipped in the week12,500
Batch size2,000
Sorting the whole week at ₹8 a part (no traceability)₹1,00,000
Sorting only the traced batch₹16,000
Saved on one complaint₹84,000

How auto components teams run ERPKaro

  • Production Order Management. Schedule-driven runs per part number and revision
  • Quality Control (QC). Incoming, in-process, and pre-dispatch inspection checklists
  • ASN. Advance shipping notices generated with every OEM dispatch
  • Handling Units Management. Bins, trolleys, and pallets tracked per dispatch
  • Return Order Management. Rejections linked to original batch and dispatch
  • Document Management. Invoices, challans, and e-way bills in the dispatch pack

Built for Indian compliance

GST e-invoicing & e-way bill

Every OEM dispatch documented at loading

IATF-style traceability records

Batch chains retrievable per lot query, the evidence IATF 16949 audits and customer complaints ask for

Tally, AI planning, QR scanning and custom reports

Accounts stay in Tally

Tally stays your accounting system. Invoices, credit and debit notes and purchase bills raised in ERPKaro flow to Tally through the integration, set up during implementation to match how your accounts team works.

An AI-drafted production schedule

ERPKaro’s AI planning drafts the week’s work orders from OEM schedules, stock and machine capacity, and re-drafts in seconds when a schedule is revised. Your planner reviews the draft, adjusts what needs judgement and approves it.

QR scanning in stores and dispatch

Bins, trolleys and cartons carry QR codes, so stores and dispatch scan them at receipt, issue and loading, and the ASN quantity is the scanned quantity.

Reports built for your plant

Beyond the standard reports, custom reports are built for your plant, such as rejection PPM by part and customer, schedule adherence by OEM, or stock at each job worker. Every figure traces back to the records behind it.

What ERPKaro costs an auto component plant

Your price depends on three numbers: the SKUs you maintain each month, your orders per month (sales and purchase orders together), and the user seats you need. Here is what the published pricing gives for one example plant.

A small machining unit supplying two Tier-1 customers

  • 120 SKUs maintained per month. Part numbers and revisions, bar stock, tools, inserts and consumables
  • 90 orders per month (sales + purchase). Schedule-driven sales orders plus purchase orders for raw material and job work
  • 8 user seats. Planning, stores, production, quality, dispatch and accounts
Pricing bandSmall (up to 10 users)
Billed monthly₹24,000 a month
Billed annually (10% off)₹21,600 a month
One-time setup₹49,999
First year, billed annually₹3,09,199

Estimated with the same formula as the pricing calculator. The final price depends on implementation scope. Extra seats beyond the band are quoted separately.

Going live in an auto component plant

Most go-lives take a few days to a few weeks, depending on scope. These are the phases of our implementation process, as they apply here.

  • Discovery. Map the schedule cycle from OEM release to dispatch: part numbers, routings, job-work vendors and ship-to plants.
  • Master data. Part numbers with revisions, BOMs, bar stock and castings, customers with their delivery plants, and job workers.
  • Configuration. Incoming, in-process and pre-dispatch inspection checklists, the ASN and dispatch pack, and approval steps customised to how your plant signs off.
  • Migration and testing. Opening stock reconciled by part and batch, including parts at job workers. Test a schedule revision and a customer rejection.
  • Training. Separate sessions for planning, stores, production, quality, dispatch and accounts.
  • Go-live. The first schedule cycle runs on ERPKaro, and the parallel spreadsheets stop after sign-off.

Frequently asked questions

Can ERPKaro work from OEM delivery schedules?

Yes. Schedule lines become production and dispatch orders, and revisions update the working plan instead of living in a separate spreadsheet.

Does it support ASN-based dispatch to OEMs?

Yes. ASNs are generated with the dispatch alongside the invoice, challan, and e-way bill.

How deep is the batch traceability?

From raw-material batch through production run to dispatched lot, in both directions, in one lookup.

Can it handle multiple plants feeding different OEMs?

Yes. Plants and warehouses run as locations in one system, with schedules, stock, and dispatches visible per customer.

How are customer rejections handled?

Return orders link the rejected lot to its original batch and dispatch, so QC gets the production context for corrective action.

Can we track parts sent out for plating or heat treatment?

Yes. Material is issued against the work order, and each job-work challan stays open until the parts come back, so the quantity outside with every job worker is visible at any time.

Can production run against a specific part revision?

Yes. Production orders are planned per part number and revision, so the shop floor builds to the revision the schedule asks for.

Can we keep Tally for our accounts?

Yes. Tally stays your accounting system and ERPKaro runs the plant. Invoices, credit and debit notes and purchase bills raised in ERPKaro flow to Tally through the integration, set up during implementation.

What does ERPKaro cost for an auto component plant?

Pricing depends on SKUs maintained, orders per month (sales and purchase orders together) and user seats. A small machining unit with about 120 SKUs, 90 orders a month and 8 users falls in the Small band, around ₹24,000 a month plus a one-time ₹49,999 setup fee. The pricing calculator gives your own estimate.

See your auto components operation on ERPKaro

Walk through your workflows with our team, or take the five-minute ERP readiness assessment to see where you stand.