Manufacturing ERP · Industrial & Engineering

ERP Software for Machinery & Industrial Equipment Manufacturing

Machinery builds run for weeks across fabrication, machining, and assembly. ERPKaro keeps engineer-to-order BOMs, subassembly progress, bought-out parts, and final dispatch on one record per machine.

01

  • Order-specific BOMs with revision control

02

  • Subassembly and fabrication progress per machine

03

  • Bought-out and long-lead parts tracked to build dates

04

  • Commissioning dispatches with full document packs

What slows machinery & industrial equipment operations down

01

Every machine is a new BOM nobody versioned

Order-specific changes are marked up on drawings; stores issue against an outdated list and assembly stalls.

How ERPKaro handles it

BOMs are versioned per order, and material issues run against the current revision, not last month’s printout.

02

Build progress is invisible between milestones

Management learns a machine is late when the dispatch date arrives; subassembly delays were known on the floor for weeks.

How ERPKaro handles it

Production orders per subassembly show progress live, so slippage surfaces while there is still time to act.

03

Bought-out parts dictate the schedule silently

Motors, gearboxes, and panels are ordered from memory; one late PO idles a finished fabrication.

How ERPKaro handles it

Purchase orders link to machine build plans, flagging at-risk deliveries against the dates that matter.

04

Dispatch is a multi-consignment puzzle

A machine ships as several packages over days; matching packages, invoices, and e-way bills strains everyone.

How ERPKaro handles it

Handling units group packages per machine, and documents generate per consignment while staying linked to the order.

05

Trial reports can’t be found at handover

Stage inspections and pre-dispatch trials are recorded on paper, and the customer’s handover pack is assembled from memory.

How ERPKaro handles it

Stage inspections and trial results are recorded against the machine, so the handover pack is pulled from one record.

06

Bought-out parts wait for approval

A motor or gearbox order sits unapproved for days while the build date stays where it was.

How ERPKaro handles it

Approval steps for purchases and dispatch, customised to how your plant signs off, are recorded on the order, so pending approvals are visible against the build.

Worked example: what one BOM revision mix-up costs

A ₹35 lakh special-purpose machine is built from a printed BOM. Twelve parts are machined to a drawing that was revised a week earlier, and the mistake is found at assembly.

The cost is not the rework alone. Every day at the assembly bench delays the next machine too. When each order carries its own BOM revision and material is issued against that revision, the shop floor builds to the current drawing.

Illustrative figures, not customer data. Use your own machine values and terms.

Parts made to a superseded drawing12
Rework and re-machining₹1.8 lakh
Assembly delay8 days
Late-delivery penalty at 0.5% a week₹20,000
Cost of one revision mix-up₹2 lakh

How machinery teams run ERPKaro

  • BOM Management. Order-specific structures with revision control
  • Production Order Management. Fabrication, machining, and assembly stages per machine
  • Purchase Order Management. Bought-out and long-lead parts against build dates
  • Handling Units Management. Multi-package dispatch grouped per machine
  • Quality Control (QC). Stage inspections and pre-dispatch trials recorded
  • Document Management. Invoices, packing lists, and e-way bills per consignment

Built for Indian compliance

GST e-invoicing & e-way bill

Multi-consignment machine dispatches documented cleanly

CE/test documentation

Trial and inspection records attached to the machine record

Tally, AI planning, QR scanning and custom reports

Accounts stay in Tally

Tally stays your accounting system. Invoices, credit and debit notes and purchase bills raised in ERPKaro flow to Tally through the integration, set up during implementation to match how your accounts team works.

An AI-drafted production schedule

ERPKaro’s AI planning drafts fabrication, machining and assembly work orders across the machines in build. Your planner reviews the draft, adjusts what needs judgement and approves it.

QR scanning in stores and dispatch

Parts and packages carry QR codes, so stores scan them at receipt and issue, and dispatch scans every package of a multi-consignment machine.

Reports built for your plant

Beyond the standard reports, custom reports are built for your plant, such as progress per machine, bought-out parts at risk, or material cost per machine. Every figure traces back to the records behind it.

What ERPKaro costs a machine-building unit

Your price depends on three numbers: the SKUs you maintain each month, your orders per month (sales and purchase orders together), and the user seats you need. Here is what the published pricing gives for one example plant.

A small special-purpose machine builder

  • 160 SKUs maintained per month. Fabricated and machined parts, bought-out motors and drives, standard hardware and consumables
  • 60 orders per month (sales + purchase). Machine and spares sales orders plus purchase and job-work orders
  • 8 user seats. Design, planning, stores, assembly, quality and accounts
Pricing bandSmall (up to 10 users)
Billed monthly₹23,000 a month
Billed annually (10% off)₹20,700 a month
One-time setup₹49,999
First year, billed annually₹2,98,399

Estimated with the same formula as the pricing calculator. The final price depends on implementation scope. Extra seats beyond the band are quoted separately.

Going live in a machine-building unit

Most go-lives take a few days to a few weeks, depending on scope. These are the phases of our implementation process, as they apply here.

  • Discovery. Map a machine from order to commissioning: fabrication, machining, assembly, bought-out parts and dispatch.
  • Master data. Order-specific BOMs with revisions, bought-out and long-lead parts, suppliers and job workers.
  • Configuration. Stage inspection and trial checklists, multi-package dispatch, and approval steps customised to how your plant signs off.
  • Migration and testing. Opening stock reconciled, including parts at job workers. Test a BOM revision mid-build and a machine shipped in several consignments.
  • Training. Separate sessions for design, planning, stores, assembly, quality and accounts.
  • Go-live. The next machine is built on ERPKaro, and the parallel spreadsheets stop after sign-off.

Frequently asked questions

Can ERPKaro handle engineer-to-order BOMs?

Yes. Each order carries its own BOM revision, and material issues and purchases run against that revision.

How does it track progress on long builds?

Subassemblies and stages run as production orders, so progress and delays are visible during the build, not after it.

Can one machine ship as multiple consignments?

Yes. Packages are handling units grouped under the machine, each consignment with its own documents but linked to the order.

Does it manage bought-out parts and subcontracting?

Yes. Purchase and job-work orders link to the build plan, with at-risk deliveries flagged against build dates.

Is it suitable for small machine shops as well?

Yes. The same workflows scale down: one shop, simpler BOMs, same visibility from order to dispatch.

Can trial and inspection records be kept with each machine?

Yes. Stage inspections and pre-dispatch trial results are recorded against the machine, so they are retrievable at handover and later.

Can purchase approvals follow our own rules?

Yes. Approval steps for purchases and dispatch are set up to match how your plant signs off, and each approval is recorded on the order.

Can we keep Tally for our accounts?

Yes. Tally stays your accounting system and ERPKaro runs the plant. Invoices, credit and debit notes and purchase bills raised in ERPKaro flow to Tally through the integration, set up during implementation.

What does ERPKaro cost for a machine-building unit?

Pricing depends on SKUs maintained, orders per month (sales and purchase orders together) and user seats. A small special-purpose machine builder with about 160 SKUs, 60 orders a month and 8 users falls in the Small band, around ₹23,000 a month plus a one-time ₹49,999 setup fee. The pricing calculator gives your own estimate.

See your machinery operation on ERPKaro

Walk through your workflows with our team, or take the five-minute ERP readiness assessment to see where you stand.