Manufacturing models · Make-to-order

Make-to-order ERP that ties every purchase, job and check to the order

In make-to-order, nothing is built until a customer confirms. That keeps finished stock low, but every order has to be planned, bought for and produced to a date. ERPKaro carries the order through BOM, material planning, purchasing, production, QC and dispatch as one record, so anyone can see where it stands.

01

  • Purchase and work orders linked to the customer order

02

  • Material reserved per job

03

  • Job-work challans tracked until return

04

  • Order status from booking to dispatch

The ERPKaro workflow

How ERPKaro runs make-to-order

The order comes first, and every step after it runs against that order. Each step is recorded in an ERPKaro module, so the order’s status is never a guess.

  1. Customer order arrives

    Customer order

    The order is confirmed with quantity, specification and delivery date.

    In ERPKaroSales & Purchase Orders
  2. Bill of materials

    The BOM for the product, or the customer’s drawing revision, is attached to the order.

    In ERPKaroBOM & Material Requirements Planning
  3. Material requirements planning

    The order’s requirements are netted against eligible stock, so only the shortfall is planned for purchase.

    In ERPKaroBOM & Material Requirements Planning
  4. Procurement

    Purchase orders are raised against the customer order, and receipts are recorded as they arrive.

    In ERPKaroProcurement Management
  5. Production

    Work orders run against the order; outside operations go out on job-work challans and are tracked until they return.

    In ERPKaroProduction Planning & Scheduling
  6. Quality control

    Stage and final inspections are recorded against the job.

    In ERPKaroQuality Control
  7. Dispatch

    The finished order ships with its documents.

    In ERPKaroDispatch Management

Is make-to-order your model?

Production starts against a confirmed customer order rather than maintaining finished goods stock.

You probably run this model if

  • You do not start production until a customer confirms
  • Orders differ in specification, drawing or quantity
  • Delivery promises depend on how fast you can buy material
  • Customers call to ask where their order is

Industries that commonly run this way

What the customer decides Product, quantity, often the drawing
Not sure? Compare all six models

Where make-to-order deliveries slip

01

Nobody can say where an order is

The customer asks for a status update, and sales calls purchase, stores and the supervisor to piece one together.

How ERPKaro handles it

The order links to its purchase orders, work orders, inspections and dispatch, so its status is one screen, not four phone calls.

02

Material bought for one order is used for another

Steel received for a confirmed job is cut for a rush order, and the first job slips by a week.

How ERPKaro handles it

Material is reserved per job, so stock received for one order does not count as free for the next.

03

Dates are promised before material is checked

Sales commits to four weeks; purchasing then finds the plate takes five to arrive.

How ERPKaro handles it

MRP nets the order’s BOM against stock when it is booked, so shortfalls are known before a date is committed.

For owners and plant heads

What you can answer when the customer calls

  • Where is this customer’s order right now?Its purchase orders, work orders, inspections and dispatch on one record.
  • Which orders are at risk of missing their date?Orders with open shortages, or work orders running behind.
  • What is out with job workers for this order?Job-work challans per order, with what is still to come back.

Illustrative example

A fabrication shop

The plant

A fabrication shop builds structural assemblies, frames and skids to customer drawings. No two orders are the same, and some operations, such as galvanising, go to outside job workers.

A typical plant described for illustration, not a customer.

How it runs in ERPKaro

  1. The order is booked with the customer’s drawing revision and a delivery date.
  2. The BOM for the assembly is attached and netted against plate, section and fastener stock.
  3. The plate shortfall becomes a purchase order linked to this job.
  4. Cutting, welding and fit-up run as work orders against the job, with material issued to each.
  5. Assemblies go to the galvaniser on a job-work challan, tracked until they come back.
  6. Final inspection passes, and the order is dispatched.

Every purchase, issue and inspection on the job traces back to the order that needed it.

What make-to-order plants use in ERPKaro

Order-linked purchasing

Purchase orders raised against the customer order that needs them.

Material reservation per job

Stock received for one order stays with that order.

Drawing revisions

The customer’s drawing revision kept with the job, so the shop builds to the right one.

Job-work challans

Material sent to job workers tracked until it returns, with the balance per job worker.

Live work-order progress

Each job’s progress updated as the shift runs, not at day end.

Inspection records per job

Stage and final inspections recorded against the order they belong to.

Frequently asked questions

What is make-to-order manufacturing?

Make-to-order (MTO) is a model where production starts only after a confirmed customer order, instead of building finished-goods stock. Fabrication shops, custom furniture makers and industrial component suppliers commonly work this way.

How does ERPKaro plan material for make-to-order?

When an order is booked, its BOM is netted against eligible stock. The shortfall becomes purchase requests and purchase orders linked to that order, and material is reserved for the job as it arrives.

Can we track job work for a make-to-order job?

Yes. Material sent out for operations such as galvanising or machining goes on job-work challans and is tracked until it returns, with the balance visible per job worker.

How is make-to-order different from engineer-to-order?

In make-to-order, the product is already defined, as a standard design or the customer’s drawing, before production starts. In engineer-to-order, designing the product is part of the order itself.

Can we run more than one manufacturing model in the same plant?

Yes. Stock runs and order-specific jobs are production orders in one plan, with material reserved per job, so they share the same machines, stores, QC and dispatch without a second system.

See one order from booking to dispatch

Book a demo with one of your own recent orders, or start with the readiness assessment.